Commercial solar power plants up to 1 MW

  • Status 3 October 2026: call JP-OVE-05 accepts applications from 12 May 2026 until the call is announced as closed.
  • It is intended for eligible business applicants for a new self-supply installation, also with an added storage system, subject to the conditions.
  • Applications are processed in order of receipt.

The conditions differ depending on the applicant, the type of installation and the date of the investment. Always open the official text of the call before applying; the summary does not replace the call documentation.