Multi-apartment buildings

Community self-supply for multi-apartment buildings

Community self-supply allows the residents of a multi-apartment building to share the generated electrical energy fairly and reduce their joint costs. We handle the entire procedure: from the consent of the co-owners and the building manager to the distribution ratios, installation and operation.

Projekt MFE ID Design Novo mesto

A shared roof. Coordinated metering points.

Before choosing the equipment, we coordinate the shared source, the participating metering points and the agreement between the participants.

Why does this approach make sense?

A shared source

The roof can serve several users rather than just one apartment.

Clear rules

The distribution ratios, responsibilities and costs must be agreed before delivery.

Professional delivery

The project requires coordinating the electrical design, the grid connection and the building management.

Agreement before choosing the capacity

01

Participants

The building manager and the co-owners define the goal and the scope of participation.

02

Distribution ratios

Before delivery, we agree how the generated energy will be distributed.

03

Responsibilities and costs

We define the participants’ responsibilities and how the costs are handled.

04

Consents and metering concept

We check the required consents, the metering points and the technical feasibility of the model.

What do we check on the building?

A typical solution includes a rooftop solar power plant, a metering concept and an agreed method of distributing the energy. If the building includes charging stations or communal loads, we address them in the design. Conditions vary between buildings and with the self-supply rules in force, so we confirm the final model after reviewing the documentation.

The key decision is the metering and contractual model: who is a member of the community and how the generation is shared among the metering points. The size of the roof alone does not answer this question.

From data to design and grid connection

01

Data collection

We review the consumption of the communal areas and the individual metering points, and the condition of the roof.

02

Participants’ agreement

The building manager and the co-owners determine the goal, the scope of participation and the required consents.

03

Design and grid connection

We prepare the technical solution and the delivery once the model and the grid connection conditions are confirmed.

Related solutions

Solar power plants for commercial buildings

Larger rooftop systems and turnkey delivery.

More information

Let us check your building’s options

Together we review your consumption, the technical options and your plans, and set the starting points for an individual design.

Answers to frequently asked questions

Do all residents have to take part?

The scope of participation depends on the agreed model, the required consents and the technical conditions. We check this with the building manager and the co-owners before preparing the design.

How is the energy distributed?

The distribution method is set in advance according to the metering points, expected consumption and the rules in force. Every model must be understandable to the participating users.

Who looks after the power plant after commissioning?

Responsibilities for operation, monitoring and maintenance are set out in an agreement between the stakeholders; JB energija can provide monitoring and servicing.