Public sector and community self-supply

Solar power plants for municipalities, public institutions and energy communities

We help the public sector and energy communities from design to operation, including public tenders and community self-supply models.

  • Reference: FE Koseze 1+2 for Energetika Ljubljana (2 × 999.57 kWp, ground-mounted solar power plant, community self-supply)
  • Reference: MFE Energetika Verovškova 1+2 (392 kWp)
Projekt POŠ Kapele

Connected generation. A coordinated community.

We start the project with an analysis of the consumption of the participating public buildings and a comparison of locations for the power plant. We connect the generation to the selected metering points according to the self-supply model and the grid connection conditions.

We define the energy sharing, the stakeholders’ responsibilities and the long-term maintenance arrangements at the design stage. The diagram illustrates how the system is connected; we check the specific model separately for each project.

Why does this approach make sense?

Multiple metering points

A community model can link the generation and consumption of several users under the appropriate rules.

Transparent responsibility

We define the roles of the owner, operator, users and contractor in advance.

Reference experience

FE Koseze 1+2 and MFE Energetika Verovškova are listed among JB energija’s references.

What do we define before choosing the capacity?

We check the applicable tender and procedural requirements with the competent institutions separately for each project.

01

Consumption and metering points

Before choosing the capacity, we analyse the consumption of the public buildings and define the participating metering points.

02

Location and grid connection

We compare locations for the power plant and check the available roof or land and the grid connection conditions.

03

Energy sharing and responsibilities

We define the self-supply model and the energy-sharing rules, and coordinate the roles of the owner, operator and users.

04

Documentation and procedures

For a tender or investment decision, we prepare the technical design and verified documentation. The scope of our involvement is determined by the order.

From the first review to operation

01

Stakeholder alignment

We define the goal, the participants, consumption and responsibilities.

02

Technical and procedural design

We check the location, grid connection, documentation and the chosen model.

03

Delivery and operation

After commissioning, we monitor generation and maintain the system to the agreed scope.

References for the public sector and communities

  • 100,92 kWp
  • Solar power plant on a public building

mFE PGE Krško

Krško Community self-supply
  • 54,45 kWp
  • Solar power plant on a public building

POŠ Veliki Podlog

Veliki Podlog Community self-supply
  • 48,36 kWp
  • Solar power plant on a public building

mFE Kulturni center Rogaška Slatina

Rogaška Slatina

A design for your buildings and community

Together we check consumption, possible locations and the participants, and set the starting points of the project.

Answers to frequently asked questions

Does the power plant have to be on a public building?

Not necessarily. We choose the location based on the available roof or land, consumption, spatial conditions and the community model.

How is the energy sharing determined?

The sharing and responsibilities must be agreed among the participants and aligned with the rules in force and the metering points.

Do you help with the documentation?

As part of development and design, JB energija prepares the technical documentation and takes part in the procedures; the scope is determined by the order and the type of project.