Knowledge base: answers to your questions about solar energy
Solar power plants
What solar power plant capacity do I need for my home?
We determine the capacity based on the household’s annual electricity consumption and heating method. As a rough guideline, 1 kWp of installed capacity in Slovenia generates around 1,000–1,100 kWh of electrical energy per year; precise sizing is prepared at the energy consultation.
Do I need a building permit?
For typical rooftop solar power plants on existing buildings, a building permit is generally not required, but the approval for connection to the distribution grid is mandatory. We handle all the procedures and inform you in advance of any specifics of your location.
What does the end of annual net metering mean for me?
The new billing system rewards the immediate use of your own electrical energy. That is why we now size new systems differently than in the past and generally recommend a battery energy storage system, which stores surplus generated electrical energy for evening and morning consumption and reduces the network-charge cost in the more expensive time blocks.
How long does the installation take?
Installation on a typical family house takes from one to a few days, depending on the system size and roof type. We agree the installation date in advance and we keep to it.
What warranties do I get?
Photovoltaic modules come with a multi-year product warranty and the manufacturer’s performance warranty, while inverters and battery energy storage systems carry warranties according to the manufacturer’s specifications. The details are clearly stated in the quote; as the official service partner, we handle warranty cases directly.
Can you build a solar power plant without an upfront investment on our part?
Yes. Under energy contracting (PPA), we finance, build and operate the solar power plant, while you pay for the generated electrical energy at an agreed, long-term stable price.
How does a solar power plant affect our network charges?
Your own generation reduces grid consumption, while a battery energy storage system additionally shaves peaks and shifts consumption into cheaper time blocks. Based on an analysis of 15-minute data, we calculate the actual effect on your billed capacity and network-charge cost.
Does the installation disrupt our production?
No. We adapt the schedule to your operations, and roof works and connections are carried out so that there are no outages, or they are agreed in advance and kept to a minimum.
Who looks after the power plant after commissioning?
We offer maintenance contracts with remote monitoring, regular inspections, thermographic surveys and responsive servicing. We have 27,000 kWp of solar power plants under maintenance contracts, which places us at the very top in Slovenia.
How does a hybrid solar power plant differ from a conventional one?
A conventional solar power plant feeds surplus generated electrical energy into the grid, while a hybrid one stores it in a battery energy storage system and consumes it when there is no generation. The difference lies in the hybrid inverter, the storage system and smart control, and in a substantially higher degree of self-sufficiency.
Which loads operate during a grid outage?
Those we define together at the design stage and connect to the backup-powered circuit: usually the refrigerator and freezer, heating, lighting and IT equipment. The duration of the supply depends on the storage system’s capacity, its islanding capability and the consumption of these devices.
How large a storage system do I need?
We determine the capacity from your consumption profile and the solar power plant’s capacity; we choose the solution with the best ratio between investment and savings.
Can I also charge the storage system from the grid?
Yes. The control system enables charging during the cheaper time blocks and discharging during the more expensive ones, which delivers savings even in the winter months with less sunshine.
How does a hybrid system reduce the network-charge cost?
In two ways: it shifts consumption from the more expensive time blocks into the cheaper ones, and it covers consumption peaks from the storage system, so the contracted or billed capacity can be lower and there are no exceedances.
Does a hybrid solar power plant mean complete independence from the grid?
No. A hybrid system substantially reduces grid consumption and exposure to the more expensive time blocks, but it does not eliminate the fixed charges and the connection. The goal is cost optimisation and security of supply, not a complete disconnection from the grid.
Can I upgrade my existing solar power plant to a hybrid one?
Yes, for the vast majority of existing systems, by replacing the inverter with a hybrid one or with an AC-coupled storage system without interfering with the existing power plant.
Can I expand the system later?
Yes. The solutions are modular: it is possible to add photovoltaic modules, expand the storage capacity, and connect an electric vehicle charging station and a heat pump into joint control.
What are the warranties and what maintenance does it require?
The warranties are separate for the photovoltaic modules, the inverter, the battery energy storage system and the installation, and are clearly stated in the quote and the equipment manufacturer’s specifications. Maintenance is minimal, with performance monitoring in the application, and we recommend an annual preventive inspection; for contract customers we monitor the system remotely and perform a comprehensive annual inspection.
What is the payback period of a hybrid solar power plant?
It depends on consumption, electricity prices, the use of time blocks and grants. Instead of a blanket estimate, we prepare a simulation on your data with an estimate of the savings.
Do you offer one-size-fits-all solar power plant packages?
No. Every home is different: roof size, orientation, heating and consumption. We size the system to your actual consumption, where needed together with a battery storage system, a heat pump and a charging station.
What is the approximate payback period for a home?
On the home page we state a reduction of the electricity cost by up to 80% and a typical payback period of 5–8 years. We prepare an exact calculation based on your consumption and the current grants.
What does turnkey delivery of a solar power plant include?
One contract and one contractor: site visit, design, documentation, grid connection approval, grant application, installation, connection, and long-term servicing and maintenance.
Do you check the roof structure before installation?
Yes. A structural assessment of the roof is part of the project documentation, together with the grid connection approval.
What matters for the decision
A structural assessment checks whether the existing structure can safely carry the additional load of the modules and the mounting system. The result depends on the specific roof; a photograph or the annual electricity consumption alone is not enough for such a decision.
How do you prepare a design for a company?
From the 15-minute load profile and an inspection of the building, we prepare a conceptual design: system capacity, self-sufficiency share, payback period and a scenario with or without a battery storage system.
What matters for the decision
For a company, the 15-minute consumption profile is important for the design: it shows when the company actually needs electricity. We then check the usable area, the connection capacity and the potential for a storage system. The annual consumption total alone does not tell you how much of the generation will be used on site.
Who is a ground-mounted solar power plant for?
For owners of degraded and lower-quality land, industrial zones and landfills, for investors, energy communities and farms, where agrivoltaics is also an option.
What does the project cycle of a ground-mounted power plant include?
Land and spatial constraint assessment, spatial planning, permits and documentation, connection capacity, construction, grid connection, and long-term operation and maintenance.
What is agrivoltaics?
Agrivoltaics combines agricultural production and electricity generation on the same land. As a pilot partner of the Agricultural Institute of Slovenia, we delivered a 52 kW pilot project at Brdo pri Lukovici.
What matters for the decision
The pilot at Brdo pri Lukovici is described in the 2025 annual report as a 52 kW project in cooperation with the Agricultural Institute of Slovenia. Such an example shows the possibility of dual land use; no conclusions about crop yield, returns or the impact on the crop can be drawn from the rated capacity alone.
Does a conventional solar power plant work during a grid outage?
No. Without a battery storage system, the system switches off during a distribution grid outage. A hybrid version can supply selected loads during an outage if backup power is provided for.
What matters for the decision
During a grid outage, a normal grid-tied power plant stops feeding in for safety reasons. Backup power requires a suitably designed hybrid inverter, separation of the selected circuits and an appropriate storage configuration. The mere presence of a battery does not mean that all loads will work during an outage.
Is the charging station connected to the solar power plant?
Yes. We plan the charging station together with the solar power plant and dynamic load management, so that charging follows your own generation and does not overload the grid connection.
What matters for the decision
Dynamic management can adjust the charging power to current generation and the consumption of other devices. How much of your own solar energy the vehicle actually receives depends on when it is charged and on the capacity of the grid connection; without data on charging habits, this share cannot be predicted.
What is a solar carport?
A solar carport is a structure over a car park on which photovoltaic modules are mounted. This way you gain electricity generation and vehicle protection on the same area.
What matters for the decision
Unlike a rooftop power plant, the modules are mounted on a freestanding structure over the parking spaces. The design needs to check the foundations, traffic routes, vehicle height, drainage and grid connection options. The carport can be combined with charging stations, but their number depends on the electrical connection.
How do I connect a heat pump to a solar power plant?
With smart control (e.g. the SG Ready function), the heat pump runs preferentially when the solar power plant is generating surplus electrical energy. Because we install both systems, we set up the connection at commissioning – with no additional work later.
Who owns the power plant under a PPA?
JB energija finances, builds, insures, maintains and retains ownership of the power plant. You provide the roof or land and buy the generated electrical energy at the price agreed on signing.
Procedures and permits
Do I need a building permit?
For typical rooftop solar power plants on existing buildings, a building permit is generally not required, but the approval for connection to the distribution grid is mandatory. We handle all the procedures and inform you in advance of any specifics of your location.
What does turnkey delivery of a solar power plant include?
One contract and one contractor: site visit, design, documentation, grid connection approval, grant application, installation, connection, and long-term servicing and maintenance.
Do you check the roof structure before installation?
Yes. A structural assessment of the roof is part of the project documentation, together with the grid connection approval.
What matters for the decision
A structural assessment checks whether the existing structure can safely carry the additional load of the modules and the mounting system. The result depends on the specific roof; a photograph or the annual electricity consumption alone is not enough for such a decision.
What does the project cycle of a ground-mounted power plant include?
Land and spatial constraint assessment, spatial planning, permits and documentation, connection capacity, construction, grid connection, and long-term operation and maintenance.
Do I need a permit or approval?
A building permit is not required for typical installations, and we arrange all the procedures with the distribution system operator and the adjustment of the electrical protections. We prepare the documentation.
What does your engineering team prepare?
Everything from the conceptual design and feasibility study to complete project documentation for photovoltaic systems, battery storage systems and hybrid projects, including spatial planning, permits and supervision.
Why does it matter who writes the documentation?
The documentation is prepared by engineers who master the entire project cycle. That is why it is written so that delivery runs without complications.
How large are the projects you design?
Photovoltaic projects of all sizes: from residential systems to ground-mounted power plants and commercial buildings.
Network charges and time blocks
What does the end of annual net metering mean for me?
The new billing system rewards the immediate use of your own electrical energy. That is why we now size new systems differently than in the past and generally recommend a battery energy storage system, which stores surplus generated electrical energy for evening and morning consumption and reduces the network-charge cost in the more expensive time blocks.
How does a solar power plant affect our network charges?
Your own generation reduces grid consumption, while a battery energy storage system additionally shaves peaks and shifts consumption into cheaper time blocks. Based on an analysis of 15-minute data, we calculate the actual effect on your billed capacity and network-charge cost.
Can I also charge the storage system from the grid?
Yes. The control system enables charging during the cheaper time blocks and discharging during the more expensive ones, which delivers savings even in the winter months with less sunshine.
How does a hybrid system reduce the network-charge cost?
In two ways: it shifts consumption from the more expensive time blocks into the cheaper ones, and it covers consumption peaks from the storage system, so the contracted or billed capacity can be lower and there are no exceedances.
Can I charge the storage system from the grid during the cheaper time blocks?
Yes. Time-based control enables charging during the cheaper blocks and discharging during the more expensive ones, which reduces the cost of network charges and supplied electrical energy even in months with less sunshine.
How does a storage system reduce a company’s costs?
On three levels: it increases the share of self-generated electrical energy, shifts consumption into cheaper time blocks and shaves peaks, allowing a lower contracted capacity.
When does retrofitting a storage system pay off?
When switching to time-block network charges, when annual net metering expires, when buying a heat pump or an electric vehicle, and in the event of frequent grid outages.
Non-repayable grants and financing
Can you build a solar power plant without an upfront investment on our part?
Yes. Under energy contracting (PPA), we finance, build and operate the solar power plant, while you pay for the generated electrical energy at an agreed, long-term stable price.
What is the payback period of a hybrid solar power plant?
It depends on consumption, electricity prices, the use of time blocks and grants. Instead of a blanket estimate, we prepare a simulation on your data with an estimate of the savings.
What is the approximate payback period for a home?
On the home page we state a reduction of the electricity cost by up to 80% and a typical payback period of 5–8 years. We prepare an exact calculation based on your consumption and the current grants.
Can I add a battery energy storage system to an existing solar power plant?
Yes. We first check the compatibility of the existing inverter; where a direct connection is not possible, we use an AC-coupled system with its own battery inverter. Retrofit installation is eligible for grants.
Who owns the power plant under a PPA?
JB energija finances, builds, insures, maintains and retains ownership of the power plant. You provide the roof or land and buy the generated electrical energy at the price agreed on signing.
Is the initial PPA analysis binding?
No. The review of consumption, the roof or area, the structure and the grid connection conditions is free and non-binding.
Can a PPA include a battery storage system?
Yes. After analysing the 15-minute load profile, we check whether a hybrid design with a battery storage system for peak shaving and lower network charges pays off.
What matters for the decision
Under energy contracting (PPA), a storage system can complement the solar power plant if the consumption profile and the contract model justify it. Any effect on peaks or the price is decided on the basis of 15-minute measurements and the specific contract terms, not just the storage system’s rated capacity.
Maintenance and servicing
Who looks after the power plant after commissioning?
We offer maintenance contracts with remote monitoring, regular inspections, thermographic surveys and responsive servicing. We have 27,000 kWp of solar power plants under maintenance contracts, which places us at the very top in Slovenia.
What are the warranties and what maintenance does it require?
The warranties are separate for the photovoltaic modules, the inverter, the battery energy storage system and the installation, and are clearly stated in the quote and the equipment manufacturer’s specifications. Maintenance is minimal, with performance monitoring in the application, and we recommend an annual preventive inspection; for contract customers we monitor the system remotely and perform a comprehensive annual inspection.
What maintenance does it require?
Customers monitor the system via the application, and we recommend an annual inspection of the protections, connections and settings. For contract customers we monitor operation remotely and take action in the event of deviations.
Who looks after the charging stations after installation?
We do: annual preventive inspections, remote diagnostics and responsive servicing keep the charging stations in perfect condition. We clearly state the equipment warranty terms in the quote.
How often does a solar power plant need inspecting?
We recommend an annual preventive inspection with measurements; for larger commercial and industrial systems, more often by agreement. Remote monitoring tracks operation every day, so nothing goes unnoticed between inspections.
What should I do after hail, a lightning strike or another damage event?
Notify us as soon as possible and avoid working on the system yourself. We carry out an extraordinary inspection with measurements and thermography, document the damage, prepare the report you need for your insurer and arrange the repair. Hidden damage to modules after hail is often only revealed by thermography.
What are the response times in the event of a fault?
Contract customers receive priority treatment with an agreed response time, and many faults are diagnosed and fixed remotely on the same day. For power plants without a contract, we respond according to team availability.
How much does a maintenance contract cost?
The price depends on the power plant’s capacity, location and scope of services. We prepare a specific quote after an initial condition assessment, which shows the actual scope of work required.
Do you also maintain power plants built by another contractor?
Yes. After an initial condition assessment we take over the maintenance of any solar power plant; as the official service partner of Sungrow and Chint Power, we also handle warranty cases for this equipment, regardless of the original contractor.
Does the contract also cover the battery energy storage system and the charging station?
Yes. The maintenance contract can cover the entire system: the solar power plant, the battery energy storage system, the electric vehicle charging station and the heat pump, with one inspection and one report for everything.
Do photovoltaic modules need cleaning?
Definitely, and how often depends on the location: rain washes away most of the dirt on its own, but at sites with more dust, pollen or agricultural emissions, deposits build up and reduce efficiency. We assess the need during the inspection; we clean with suitable equipment and demineralised water, without high-pressure methods that could damage the modules.
Why does a maintenance contract pay off?
For a 500 kWp power plant, just 1% of lost output means more than 5,000 kWh of lost generation per year. The cost of the contract is generally lower than the generation that regular inspections preserve.
Are you an official service partner of the manufacturers?
Yes. As the official service partner of Sungrow and Chint Power, we handle warranty and service cases directly with the manufacturer.
Battery energy storage systems
How does a hybrid solar power plant differ from a conventional one?
A conventional solar power plant feeds surplus generated electrical energy into the grid, while a hybrid one stores it in a battery energy storage system and consumes it when there is no generation. The difference lies in the hybrid inverter, the storage system and smart control, and in a substantially higher degree of self-sufficiency.
Which loads operate during a grid outage?
Those we define together at the design stage and connect to the backup-powered circuit: usually the refrigerator and freezer, heating, lighting and IT equipment. The duration of the supply depends on the storage system’s capacity, its islanding capability and the consumption of these devices.
How large a storage system do I need?
We determine the capacity from your consumption profile and the solar power plant’s capacity; we choose the solution with the best ratio between investment and savings.
Can I also charge the storage system from the grid?
Yes. The control system enables charging during the cheaper time blocks and discharging during the more expensive ones, which delivers savings even in the winter months with less sunshine.
Can I upgrade my existing solar power plant to a hybrid one?
Yes, for the vast majority of existing systems, by replacing the inverter with a hybrid one or with an AC-coupled storage system without interfering with the existing power plant.
Can I add a battery energy storage system to an existing solar power plant?
Yes. We first check the compatibility of the existing inverter; where a direct connection is not possible, we use an AC-coupled system with its own battery inverter. Retrofit installation is eligible for grants.
How do I choose the right storage capacity?
We determine the capacity from your consumption profile, the solar power plant’s capacity and your goal (self-sufficiency, time blocks, peak shaving). We prepare a simulation showing the effect of different capacities on your electricity bill and choose the one with the best ratio between investment and savings.
Will the system work during a grid power outage?
Yes, if backup power is included: during an outage the storage system automatically takes over the supply of selected circuits. Together we define which loads are essential, and the duration of the supply depends on the storage system’s capacity and their consumption.
Can I charge the storage system from the grid during the cheaper time blocks?
Yes. Time-based control enables charging during the cheaper blocks and discharging during the more expensive ones, which reduces the cost of network charges and supplied electrical energy even in months with less sunshine.
How does a storage system reduce a company’s costs?
On three levels: it increases the share of self-generated electrical energy, shifts consumption into cheaper time blocks and shaves peaks, allowing a lower contracted capacity.
What are the service life and warranty?
Quality LFP systems are designed for several thousand charging cycles, which in practice means 10 to 15 or more years of operation. Manufacturers’ warranties are usually 5 years or tied to the number of cycles or the remaining capacity, and are clearly stated in the quote.
Is a battery energy storage system safe?
Yes. We install exclusively systems with lithium iron phosphate (LFP) technology, which is considered the most thermally stable, with multi-level protections and the appropriate certificates. We choose the installation location according to the manufacturer’s instructions: a ventilated technical room or garage, or an outdoor version with the appropriate IP protection.
Do I need a permit or approval?
A building permit is not required for typical installations, and we arrange all the procedures with the distribution system operator and the adjustment of the electrical protections. We prepare the documentation.
Can I also earn money with a storage system?
As the flexibility market develops, controlled battery energy storage systems will be able to participate in demand response and ancillary services and generate additional revenue. We design systems to be ready for this; the possibilities depend on market developments and the size of the system.
What maintenance does it require?
Customers monitor the system via the application, and we recommend an annual inspection of the protections, connections and settings. For contract customers we monitor operation remotely and take action in the event of deviations.
What if the existing inverter does not support a storage system?
We use an AC-coupled system with its own battery inverter. The storage system operates alongside the existing power plant without interfering with it. With a hybrid inverter, the storage system is connected directly.
What matters for the decision
An AC-coupled upgrade uses a separate battery inverter, so the existing photovoltaic power plant can generally stay as it is. Before choosing, we check the compatibility of metering, control and any backup power. This is a technical option, not a promise that it will suit every existing system.
When does retrofitting a storage system pay off?
When switching to time-block network charges, when annual net metering expires, when buying a heat pump or an electric vehicle, and in the event of frequent grid outages.
Can a PPA include a battery storage system?
Yes. After analysing the 15-minute load profile, we check whether a hybrid design with a battery storage system for peak shaving and lower network charges pays off.
What matters for the decision
Under energy contracting (PPA), a storage system can complement the solar power plant if the consumption profile and the contract model justify it. Any effect on peaks or the price is decided on the basis of 15-minute measurements and the specific contract terms, not just the storage system’s rated capacity.
Electric vehicle charging stations
Which charging station power should I choose?
For the home, the optimal power is generally 11 kW with a three-phase connection and 7.4 kW with a single-phase one; 22 kW only makes sense if both the connection and the vehicle allow it. For businesses, we determine the power and number of charging stations from the vehicle fleet and the available connection capacity.
Is the charging station compatible with my vehicle?
Yes. The European connector standard is Type 2, which is used by the vast majority of electric vehicles; for less common versions we use a suitable cable. We take your vehicle’s specifications into account in the quote.
How long does charging at home take?
It depends on the charging station’s power and the capacity of the vehicle’s battery: at 11 kW a typical vehicle charges in a few hours, usually overnight. For everyday driving, a shorter top-up is usually enough.
Do I need to increase the building’s connection capacity?
Generally not. Dynamic load management continuously adapts charging to the building’s consumption and protects the main fuses, so the charging station works on the existing connection. We check the actual situation during the site visit.
How do we handle charging billing in a company or a multi-apartment building?
With user authorisation (RFID card or app) and a back-end system that records every charging session per user.
When does a DC charging station pay off?
When vehicles need fast charging in a few dozen minutes: for vehicle fleets with high utilisation, in logistics and at locations with shorter parking times. For most businesses, the optimal combination is AC charging stations with one DC charging station.
Is the charging station suitable for outdoor installation?
Yes. We choose models with the appropriate IP rating against water and dust and resistance to temperature and UV light; an even more elegant solution is installation under a solar carport.
Who looks after the charging stations after installation?
We do: annual preventive inspections, remote diagnostics and responsive servicing keep the charging stations in perfect condition. We clearly state the equipment warranty terms in the quote.
How long does installing a charging station take?
A home charging station, including configuration, is generally installed in one day. For commercial systems with several charging points, we set the schedule in advance; we carry out the work without disrupting your operations.
Is the charging station connected to the solar power plant?
Yes. We plan the charging station together with the solar power plant and dynamic load management, so that charging follows your own generation and does not overload the grid connection.
What matters for the decision
Dynamic management can adjust the charging power to current generation and the consumption of other devices. How much of your own solar energy the vehicle actually receives depends on when it is charged and on the capacity of the grid connection; without data on charging habits, this share cannot be predicted.
What is a solar carport?
A solar carport is a structure over a car park on which photovoltaic modules are mounted. This way you gain electricity generation and vehicle protection on the same area.
What matters for the decision
Unlike a rooftop power plant, the modules are mounted on a freestanding structure over the parking spaces. The design needs to check the foundations, traffic routes, vehicle height, drainage and grid connection options. The carport can be combined with charging stations, but their number depends on the electrical connection.
Heat pumps
Can a heat pump replace an oil or gas boiler?
Yes. Before the replacement we check the building’s heat losses, the temperature regime and the existing heat emitters. Modern high-temperature heat pumps reach flow temperatures that are also suitable for radiator heating, so in most cases the replacement does not require new radiators.
Does a heat pump work efficiently even at –20 °C?
Yes. Models with Zubadan (Mitsubishi Electric) and T-CAP (Panasonic) technology maintain full heating output far below freezing, and Kronoterm heat pumps are developed and tested for the Slovenian climate. For the coldest days the system has a built-in backup electric heater, which switches on only in exceptional cases.
What heat pump output do I need?
We determine the output by calculating the building’s heat losses, taking into account insulation, windows, orientation and the heating method. Correct sizing is key to the efficiency and service life of the unit, which is why we never prepare a quote without a site visit and a calculation.
Is a heat pump suitable for radiators or only for underfloor heating?
Both. Underfloor heating allows the highest efficiency thanks to its lower temperatures, while for radiator heating we choose a model with a higher outlet temperature or, where necessary, increase the heating surfaces.
How loud is the outdoor unit and where do we place it?
Modern outdoor units operate quietly, comparable to a quieter household appliance. We choose the location taking into account the distances from neighbouring buildings, the direction of the air discharge and anti-vibration mounts, so that the noise disturbs neither you nor your neighbours.
Does a heat pump also prepare domestic hot water?
Yes. Domestic hot water is prepared in an integrated or separate cylinder, with time schedules and an anti-legionella overheating programme. Standalone domestic hot water heat pumps are also available.
How long does installing a heat pump take?
Replacing an existing boiler with an air-to-water heat pump usually takes one to three days. Geothermal versions take longer because of the borehole or ground collector; we set the timeline in the project schedule.
How do I connect a heat pump to a solar power plant?
With smart control (e.g. the SG Ready function), the heat pump runs preferentially when the solar power plant is generating surplus electrical energy. Because we install both systems, we set up the connection at commissioning – with no additional work later.
Do you install heat pumps on a turnkey basis?
Yes. Turnkey installation includes the design, installation and connection to a solar power plant where it makes sense. We also check the current grants.
Does a heat pump both cool and heat?
Yes. We use heat pumps for heating, cooling and domestic hot water.
No results for your search term.