- Private individuals (Borzen): EUR 675/kW for new self-supply solar power plants with a battery storage system (versus EUR 180/kW without one) and EUR 275/kWh for retrofitting a storage system.
- Status 3 October 2026: on its overview page, Borzen states that applications are being accepted for installations without annual net metering (JP-SO-02).
- Check the deadline and the availability of funds in the official call before applying; the overview page does not give a fixed closing date.
The conditions differ depending on the applicant, the type of installation and the date of the investment. Always open the official text of the call before applying; the summary does not replace the call documentation.










